Wind Farm Development and Operation

WYBELSUMER WIND PARK


Brief Presentation of Wind Farm Details

Area: 380 hectares
Total output: 70 MW
Wind Turbines: 42 x E 66
1.500 kW
63 MW
1 x TW 1.5
1.500 kW
1.5 MW
5 x E 40
500 kW
2.5 MW
6 x TW 500
500 kW
3.0 MW
Total
70 MW

Operator:
1. WWP Wind farm Wybelsumer Polder GmbH & Co.
2. EWE Ltd.
3. SWE Stadtwerke Emden GmbH
4. ENERCON GmbH

Investment:
90 Mill. Euros
Annual energy output:
approx. 180 Mill. KWh
Annual turnover:
approx. 17.0 Mill. Euros

Development and Planning:

I f E GmbH & Co. KG
Managing Director: Dipl.-Ing. Klaus van Ahrens

Office: 26721 Emden
Ringstrasse 2
Tel.: +49 (0) 4921-9785-0
Fax: +49 (0) 4921-9785-19


Year of foundation: 1994
10 founding members, 9 resident in Emden/ Wybelsumer Polder.
Managing Director: Dipl.-Ing. Klaus van Ahrens
Office:
26721 Emden
Ringstrasse 2

Tel.: +49 (0) 4921-9785-0 / fax: +49 (0) 4921-9785-19

Employees:
The company permanently employs two employees, for business and works management duties.
In addition, two teams with two employees each of the company ENERCON are responsible for maintenance and service.
One quality control technician.


WEC-(wind turbine types)

Last up-date 03.09.2001

WEC (Wind Turbine) type: 20 x ENERCON E-66
Performance: 1.500 kW
Rotor diameter: 66 m
Rotor circling area: 3.421 sq m
Number of rotor blades: 3
Rotor revolutions per minute: 10-20 per/min
Gearing: Direct drive
Height: 67 m
Type of tower: Steel tower, conical

Investment program

Last update: 03.09.2001
Investment program

Building costs
Item
DM
%
1
20 ENERCON E-66 Wind energy converter incl. foundation
61,000,000
72.79
2
Wiring
258,951
0.31
3
Access
1,403,835
1.68
4
Mains connection
11,096,560
13.24
5
Compensation
1,173,569
1.40
6
Authorization, technical engineering
1,680,000
2.00
7
Subtotal
76,612,915
91.42

Development and technical and business administration

8
Technical project development and management
1,300,000
1.55
9
Economic concepts
600,000
0.72
10
Architectural planning and monitoring
671,000
0.80
11
Business project management
1,200,000
1.43
12
Subtotal
3,771,000
4.50

Foundation and starting up

13
Certificates and other services
400,000
0.48
14
Project brochure
100,000
0.12
15
Checking brochure and use of funds
100,000
0.12
16
Accountancy fees
1,550,000
1.85
17
Legal and general advice, final annual audit, advisory board
250,000
0.30
18
Unexpected expenditures
1,016,085
1.21
19
Subtotal
3,416,085
4.08
20
Total costs
83,800,000
100.00

Forecast Turnover Rates

Last update: 03.09.2001

Annual energy output:20 x 3.9 Mill.KWh
Earned income for first 8 years: 0.178 DM/kWh
Earned income after 8 years: 0.121 DM/kWh
Gross annual income 16 Mill. DM
Corporation tax paid
to the city of Emden:
8th - 20th years
of operation:
Approx. 22 Mill. DM

Criteria of Authorization and Acceptance

Last update: 03.09.2001

Environmental
compatibility:
An environmental compatibility study (UVS) was ordered and approved by the ministry of the environment of Lower Saxony in June 1997.
Landscape: In co-operation with the Environment Office an additional plan for the landscape conservation was developed on the grounds of the environmental compatibility study (UVS).
Scenery: Disturbances of the landscape in the Wybelsumer Polder were minimized by means of various planting measures covering 4.5 km.
Fauna: The impact on the fauna was examined and assessed in the environmental compatibility study and accompanying landscape conservation plan. These showed that the measures taken were environmentally friendly and sufficiently compensated for.
Noise pollution: A max. Noise limit of 100 dB (A) is guaranteed by the company Enercon GmbH for each wind energy converter.
All noise levels are below recommended noise levels (mixed area: 45dB(A), residential area: 40dB(A)).
Wind shadow: A study by the German Institute for Wind Energy identifies a number of areas affected by shadows. These problem areas are responded to by specific management schemes of the system.
Noise pollution and wind shadow: For the running permission procedure, the city of Emden ordered the Technical Inspection Agency (TUV Nord). The TUV was asked to check the surveys of noise pollution and shadows in terms of plausibility. The TUV Nord applied this to the E66 and drafted an expert's summary.
Disco effect: The reflection caused by the rotor blades (Disco effect) is effectively prevented by using a non-reflective coating.
Infrasound: Recent surveys show that infrasound had no effect on people.
Decommissioning: After 20-25 years the wind energy converter is dismantled down to foundation. The costs for dismantling are covered by accumulated reserves from the annual income.
Agriculture: Five farmers are affected by necessary compensation and construction measures for access ways in the Wybelsumer Polder. Future hardship claims are currently examined and covered by the city of Emden and the port authorities of Lower Saxony.
Compensation
and replacement
measures:
The impacts on the environment and landscape were compensated by appropriate measures in compensation areas within the Wybelsumer Polder and around the "Gross Midlumer Meede" (borough of Hinte).
Maintenance
and Service:
Interruptions and breakdowns of machinery are covered by an on-site service facility. In case of an emergency, a service team is at hand at all times.

Noise Emissions

VDI-regulation 2058 "Assessment of work noise in the neighbourhood"
VDI-regulation 2714 "Noise dispersion in the open air"
DIN18005 "Noise protection in urban development"

Last update: 03.09.2001

Classification
Standards for harmful effects of noise
"Day time"
6:00 - 22:00
Standards for harmful effects of noise
"Night time"
22:00 - 6:00
Mixed areas
60 dB (A)
45 dB (A)
Residential areas
55 dB (A)
40 dB (A)

Saving of Harmful Emissions p.a.

eg : greenhouse gases, dust, nuclear waste

Substance
WWP
EWE
Total
Unit
Carbon dioxide
120.312
80.208
200.520
Tonne
Sulphur dioxide
767
511
1.278
Tonne
Nitrogen oxide
302
202
504
Tonne
Carbon monoxide
97
65
162
Tonne
Dust
19
13
32
Tonne
Nuclear waste
335
223
558
Kg

Total output / p.a.: 180 Mill. KWh

This wind energy output provides emission free energy for at least 54,000 private houses!